Stepnell signs a £13.8m contract with the London Borough of Hillingdon to design and build an extra care facility. Stepnell appoint SWS Ltd to provide waterproofing installation and related works to the below ground structure
- Full waterproofing using both cementitious and cavity membrane system
- Working closely with the groundworks company to achieve effective project phasing
- Waterproofing with cavity membrane to retaining walls and below ground slab
- Cementitious system applied to lift shafts
- Sealing of pile caps
- Complete system utilising products from FIS
- A complete detailing and installation solution supported with an insurance backed 10-year guarantee